<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Constraint-based scheduling – M365.FM</title><link>https://www.m365.fm/entity/constraint-based-scheduling/</link><description>A production scheduling approach that places each operation on a real resource and time slot only when hard constraints such as machine capability, tooling, labor skills, material release and precedence are met, then compares feasible options against business objectives.</description><language>en</language><item><title>Using Power Platform and Azure to Build Finite-Capacity Manufacturing Schedules</title><link>https://www.m365.fm/community/u/mirko-p/blog/power-platform-azure-finite-capacity-manufacturing-schedules/</link><guid>https://www.m365.fm/community/u/mirko-p/blog/power-platform-azure-finite-capacity-manufacturing-schedules/</guid><pubDate>Fri, 09 Oct 2026 07:26:38 -0000</pubDate><category>article</category><description>Learn how to build finite-capacity manufacturing schedules using Azure, Power Platform, and Microsoft Fabric to bridge ERP plans and shop-floor reality.</description></item><item><title>Production Schedule Optimization - How to Build Better Production Schedules</title><link>https://www.m365.fm/show/episodes/production-schedule-optimization/</link><guid>https://www.m365.fm/show/episodes/production-schedule-optimization/</guid><pubDate>Fri, 09 Oct 2026 00:00:00 -0000</pubDate><category>episode</category><description>A production schedule can look correct while the factory has already moved on. A machine runs slower than expected, a setup takes longer, material is still waiting for release, or an urgent order enters the plan. ERP still shows the original dates, MES shows…</description></item><item><title>Hard vs Soft Production Constraints in Finite Scheduling: A Manufacturing Guide</title><link>https://www.m365.fm/community/u/mirko-p/blog/hard-vs-soft-production-constraints/</link><guid>https://www.m365.fm/community/u/mirko-p/blog/hard-vs-soft-production-constraints/</guid><pubDate>Tue, 15 Sep 2026 18:22:28 -0000</pubDate><category>article</category><description>Discover the critical difference between hard and soft production constraints in finite scheduling to prevent factory bottlenecks and missed deadlines.</description></item><item><title>Constraint-Based Scheduling: The Architecture That Makes Production Plans Real</title><link>https://www.m365.fm/show/episodes/constraint-based-scheduling/</link><guid>https://www.m365.fm/show/episodes/constraint-based-scheduling/</guid><pubDate>Tue, 15 Sep 2026 00:00:00 -0000</pubDate><category>episode</category><description>Production plans that look fine in ERP fall apart when a machine fails, a fixture is busy or material is still in inspection. This episode walks manufacturing planners, IT/OT architects and operations leaders through constraint-based scheduling in a…</description></item></channel></rss>