<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>SMED – M365.FM</title><link>https://www.m365.fm/entity/smed/</link><description>A method for shortening changeover and setup times on machines by separating the work that needs the machine to be stopped from the work that can be done while it runs, and then simplifying both.</description><language>en</language><item><title>Changeover Reduction: How to Apply SMED in Practice</title><link>https://www.m365.fm/community/u/mirko-p/blog/smed-changeover-reduction-in-practice/</link><guid>https://www.m365.fm/community/u/mirko-p/blog/smed-changeover-reduction-in-practice/</guid><pubDate>Wed, 11 Nov 2026 00:00:00 -0000</pubDate><category>article</category><description>SMED cuts changeover time by moving work outside the machine stop. Five steps and a worked example for quick changeover on your own line, starting this week.</description></item><item><title>Lean in Aerospace Manufacturing: What Works at Low Volumes</title><link>https://www.m365.fm/community/u/mirko-p/blog/lean-aerospace-manufacturing-low-volumes/</link><guid>https://www.m365.fm/community/u/mirko-p/blog/lean-aerospace-manufacturing-low-volumes/</guid><pubDate>Wed, 11 Nov 2026 00:00:00 -0000</pubDate><category>article</category><description>Lean aerospace manufacturing works at low volumes when you level demand, group part families and cut changeovers. A practical guide for plant managers.</description></item><item><title>High-Mix Low-Volume Production Planning: 7 Practical Tips</title><link>https://www.m365.fm/community/u/mirko-p/blog/high-mix-low-volume-production-planning-tips/</link><guid>https://www.m365.fm/community/u/mirko-p/blog/high-mix-low-volume-production-planning-tips/</guid><pubDate>Wed, 11 Nov 2026 00:00:00 -0000</pubDate><category>article</category><description>High mix low volume production planning needs real capacity, short changeovers and part families. Seven practical tips for production managers, with an example.</description></item></channel></rss>