Closed-loop production scheduling

Concept

An operating approach in which planning, shop-floor execution, measurement, learning and replanning form a continuous feedback loop, so schedules are revised from the current production state instead of staying static after release.

✦ CONCEPTClosed-loop productionschedulingM365.FM