M365Con 2027 – free online conference · 11–22 Jan 2027 · 120 sessions m365con.net

Capable to promise (CTP)

Concept

Capable to promise is an order promising approach in which the delivery date is derived from what the factory can currently do given material, routing, resource, labor and shipping limits, rather than from a static lead time.

✦ CONCEPTCapable to promise (CTP)M365.FM
Title graphic: Capable to promise (CTP) (Concept)

Also discussed

The episode about Capable to promise (CTP) also covers Available to promise (ATP), Finite capacity scheduling, Overall equipment effectiveness (OEE), Enterprise resource planning (ERP), Knowledge graph and Manufacturing execution system (MES).

Description

Capable to promise (CTP) is an order promising approach in which the delivery date offered to a customer is derived from what the factory can currently do, given constraints such as material, routing, resources, labor and shipping, rather than from a fixed, static lead time. The idea is to answer a sales question with a date that reflects real production conditions instead of a standard estimate that may no longer hold.

In practice, CTP is used when a salesperson or customer service team needs to know whether a quantity of an item can be delivered by a requested date, how soon a quantity could arrive, or how much could ship before a month ends. Because the answer rests on the state of supply and capacity at the time of the request, it can change from one request to the next as orders, stock and resource loads change.

The Infor LN documentation describes CTP as a group of order-promising techniques rather than a single method. They range from basic available-to-promise (ATP) checks on standard items to more advanced approaches, and each one draws on a different source of availability. Standard ATP uses supply that is already planned for the product. Capacity CTP looks at capacity that could be converted into deliverable supply. Component CTP uses the ATP of components linked to the product. Channel ATP considers the maximum volume that can be sold through a particular channel, and family CTP supports long-term promising at product-family level. The same documentation notes that CTP is also supported for customised items.

These variants matter for the decision of which technique to apply. A check against planned supply answers a different question than a check that converts spare capacity into new supply, and a check that depends on component availability answers yet another. The choice depends on what limits delivery for a given product: finished stock already planned, free production capacity, or the availability of the parts that go into it. Family-level promising, by contrast, serves longer-term commitments where item-level detail is not yet available.

Multisite environments add a further consideration. According to the Infor LN documentation, when multisite functionality is active, CTP and ATP calculations run per planning cluster. If a cluster is linked to several sites, the checks use the combined supply across those sites, so a promise can reflect more than a single location.

The documentation identifies the kinds of information consulted when a promise request is answered, but it does not describe step by step how a delivery date is calculated. This page therefore stays at the level of the concept: CTP ties a promise date to present capability and supply, in contrast to relying on a static lead time, and it sits alongside ATP as part of the wider set of order-promising techniques. No M365.FM episodes are linked to this topic at present.

Overview compiled with AI from M365.FM episodes and the facts on this page. You can improve it with the edit button below.

TypeConcept

Episodes about Capable to promise (CTP)

Episodes in which Capable to promise (CTP) is discussed:

What Happens When Sales Promises an Urgent Order

2026-10-11

When sales promises an urgent delivery date, the order lands in a factory schedule that is already full, and other customers quietly absorb the delay. This episode is for manufacturing planners, operations leaders and data architects who connect ERP, MES and…

Frequently asked questions

Questions marked with AI were written with AI from the facts on this page.

What is capable to promise (CTP)? (AI)

Capable to promise is an order promising approach that sets a delivery date based on what the factory can currently do, given material, routing, resource, labor and shipping limits, instead of a static lead time.

How does CTP differ from available to promise (ATP)? (AI)

According to the Infor LN documentation, CTP is a group of techniques that includes basic ATP checks on standard items as well as approaches such as capacity CTP, component CTP, channel ATP and family CTP, each drawing on a different source of availability.

How does CTP work in multisite setups? (AI)

The Infor LN documentation states that with multisite functionality active, CTP and ATP calculations run per planning cluster. If a cluster is linked to several sites, the checks use the combined supply across those sites.

Glossary

Community wiki

Short info above, community knowledge below: add practical tips, examples or corrections. New contributions are reviewed first; trusted members publish directly.

Experts and companies for this topic

Nobody has listed this topic yet. Add it to your profile.

Sources

Maintained by Mirko Peters (Microsoft MVP) · Last updated: