M365Con 2027 – conferencia online gratuita · 11–22 Jan 2027 · 120 sessions→ m365con.net

8 wastes of lean

Concepto

The eight kinds of waste (muda) in lean: defects, overproduction, waiting, unused talent, transport, inventory, motion and extra processing. Each consumes resources without adding value for the customer.

✦ CONCEPTO8 wastes of leanM365.FM
Título gráfico: 8 wastes of lean (Concepto)

Descripción

Lean describes eight kinds of waste, called muda in Japanese. They are activities that use resources but add no value for the customer: defects, overproduction, waiting, unused talent, transport, inventory, motion and extra processing. A common memory aid is the word DOWNTIME, which takes its letters from these eight names.

The list is a lens for observation. Walking through a process with it, people notice scrap and rework, parts waiting in queues, long walking distances or steps nobody needs. Not all non-value-adding work can be removed at once, because some of it, such as inspections required by law, is necessary. The first step is to see it. Value stream mapping shows where the waste sits in the flow, and kaizen events reduce it step by step.

TipoConcepto
También conocido comoEight wastes, Muda, Acht Verschwendungsarten
Wikipediaen.wikipedia.org/wiki/Muda_(Japanese_term)

Artículos sobre 8 wastes of lean (1)

8 wastes of leaniFAKT GmbHRelated toPolaris VSMRelated toValue stream mappingRelated toLean managementRelated toValue stream managerRelated toLead timeRelated toScrap rateRelated toSpaghetti diagramRelated to
Mapa de relaciones de los 8 desperdicios del lean: temas vinculados

Related to

Glosario

Community wiki

Short info above, community knowledge below: add practical tips, examples or corrections. New contributions are reviewed first; trusted members publish directly.

Expertos y empresas para este tema

Nadie ha indicado aún este tema. Añádelo a tu perfil.

Fuentes

Mantenido por Mirko Peters (Microsoft MVP) · Última actualización: