Lead time
Concepto
The total time from the start of an order or part until it is finished, including all waiting. In most plants, waiting makes up far more of it than actual work.
Descripción
Lead time, in German Durchlaufzeit, is the full time a part or order needs to move through a process, from start to finish. It includes processing, but also queues, transport, inspection and every other wait. Seen from the customer, lead time can also mean the time from order to delivery.
In many plants, most of the lead time is waiting, not work. That is why lead time is a key figure on a value stream map, shown next to the processing time of each step. Shortening it usually means reducing queues and work in progress, smaller batches and a steadier flow. Little's law, a rule from queueing theory, links the three: work in progress equals throughput times lead time.
| Tipo | Concepto |
|---|---|
| También conocido como | Durchlaufzeit, Production lead time, Throughput time, Lieferzeit |
Artículos sobre Lead time (8)
- Por qué las fechas de producción del ERP son ficticias: la brecha entre la planificación y la realidad de la planta
· Mirko Peters
Descubre por qué las fechas de producción de los sistemas ERP tradicionales generan una falsa sensación de certidumbre y cómo la programación APS de capacidad finita salva esa brec - Por qué los paneles de fabricación en tiempo real no muestran el flujo de producción
· Mirko Peters
Descubre por qué los paneles de fabricación en tiempo real no explican los cuellos de botella de producción y cómo pasar a un modelo de cadena de valor en vivo aporta verdadera int - Más allá del panel verde: por qué los KPI tradicionales de DevOps fallan en la era de la IA
· Mirko Peters
Bienvenido de nuevo a la extensión en blog de nuestra serie de podcasts. Si abres hoy cualquier panel ejecutivo del sector tecnológico, es casi seguro que verás un mar de indicador - Lead Time vs Cycle Time vs Takt Time: What Is the Difference?
· Mirko Peters
Lead time vs cycle time vs takt time: three numbers that answer three different questions. Learn which one shows waiting, which shows pace and how to use them. - Batch Size in Manufacturing: How Smaller Batches Cut Lead Time
· Mirko Peters
Batch size in manufacturing decides how long parts wait. See why smaller batches cut lead time, what they cost and when short changeovers make them pay off. - Why ERP Production Dates Are Fake: The Gap Between Planning and Shop Floor Reality
· Mirko Peters
Discover why traditional ERP production dates create false certainty and learn how finite-capacity APS scheduling bridges the gap in manufacturing. - Why Real-Time Manufacturing Dashboards Fail to Show Production Flow
· Mirko Peters
Discover why real-time manufacturing dashboards fail to explain production bottlenecks and how shifting to a live value stream model delivers true operational intelligence. - Beyond the Green Dashboard: Why Traditional DevOps KPIs Are Failing in the Age of AI
· Mirko Peters
Welcome back to the blog extension of our ongoing podcast series. If you open up any executive dashboard in the tech industry today, you are almost guaranteed to se…
Related to
- iFAKT GmbH · Organización
- Cycle time · Concepto
- Work in progress (WIP) · Concepto
- Value stream mapping · Concepto
- 8 wastes of lean · Concepto
- Polaris VSM · Producto
- Batch size · Concepto
Community wiki
Short info above, community knowledge below: add practical tips, examples or corrections. New contributions are reviewed first; trusted members publish directly.
Expertos y empresas para este tema
- Mirko Peters · Microsoft MVP
Fuentes
- Feed de este tema (RSS): entity/lead-time/feed.xml
- Artículos sobre este tema: 8
Mantenido por Mirko Peters (Microsoft MVP) · Última actualización: