Aug. 21, 2026

Dynamics 365 Transportation Management - Simply Explained

Dynamics 365 Transportation Management - Simply Explained
Dynamics 365 Transportation Management - Simply Explained
M365 FM Podcast
Dynamics 365 Transportation Management - Simply Explained

Key Takeaways

  • Dynamics 365 Transportation Management serves as the central transportation desk within Dynamics 365 Supply Chain Management, connecting warehouses, vendors, customers, and carriers.
  • Using load templates and volume-based load building helps organizations efficiently group compatible shipments and check vehicle capacity limits before physical work begins.
  • The Rate Route Workbench allows transportation planners to compare different route and rate options side by side, balancing delivery speed against transportation costs.
  • Built-in transportation management focuses on structured internal planning using organization-maintained rate tables rather than acting as a live multi-carrier marketplace.
  • Connecting transportation plans with warehouse execution ensures that picking, packing, staging, and freight reconciliation all reference a single, shared movement record.

Dynamics 365 Transportation Management connects the movement of physical goods with sales orders, purchase orders, warehouse operations, carriers, routes, rates, loads, and freight costs. Instead of managing transportation through separate spreadsheets, emails, carrier rate sheets, and phone calls, organizations can create a connected transportation plan directly inside Dynamics 365 Supply Chain Management. In this episode of M365 FM, Mirko Peters explains how Transportation Management works from the moment goods need to move through load planning, carrier selection, warehouse execution, delivery, and freight reconciliation.

WHAT IS DYNAMICS 365 TRANSPORTATION MANAGEMENT?
Dynamics 365 Transportation Management is the transportation planning capability inside Dynamics 365 Supply Chain Management. It connects warehouses, vendors, customers, carriers, orders, shipments, and freight costs. Think of it as the transportation desk inside the organization. Sales creates customer demand, purchasing manages incoming goods, warehouse teams prepare inventory, and Transportation Management determines how those goods should move between locations. The objective is to create one connected transportation process instead of maintaining separate lists and manual handoffs between departments.

WHY TRANSPORTATION MANAGEMENT MATTERS
A sales order doesn't physically move inventory. Goods still need a truck, trailer, container, or another form of transportation. Someone needs to determine where those goods originate, where they need to arrive, how much space they require, when they need to leave, and what transportation should cost. The challenge becomes significantly larger when a business manages hundreds of orders, several warehouses, multiple carriers, incoming supplier deliveries, customer shipments, and transfers between its own locations. Transportation Management provides a shared system for coordinating these movements.

INBOUND TRANSPORTATION
Inbound transportation covers goods moving into the organization. A purchase order might contain products expected from a supplier. Depending on the agreement, either the supplier or the purchasing organization may arrange transportation. When the organization manages that transportation, Dynamics 365 can connect the expected goods with a planned inbound load. Warehouse teams therefore gain visibility into what should arrive before the truck reaches the loading dock.

OUTBOUND TRANSPORTATION
Outbound transportation covers goods leaving the organization. A customer places a sales order, the warehouse prepares the products, and a carrier transports them to their destination. Transportation Management connects that sales demand with the shipment, load, carrier, route, service, and expected transportation cost. This allows warehouse and transportation teams to work around the same movement rather than independently planning different parts of the shipment.

TRANSPORTATION FOR TRANSFER ORDERS
Goods don't always move between a company and a customer or supplier. Organizations frequently transfer inventory between their own warehouses or sites. Dynamics 365 Transportation Management can include transfer orders within outbound transportation planning. From the loading dock's perspective, inventory still needs vehicle capacity, loading, transportation, and receiving regardless of whether the destination is a customer or another company warehouse.

WHAT IS A LOAD?
A load is the digital record representing a planned movement of goods. You can think of it as one truck, trailer, container, or collection of shipments traveling together. Several customer shipments might share one truck, while one particularly large customer order could require an entire trailer. The important idea is that Dynamics 365 doesn't require businesses to treat every individual order as a completely separate transportation job. Compatible shipments can be grouped into a shared transportation plan.

CONSOLIDATING SHIPMENTS
Imagine six customer orders are leaving the same warehouse for approximately the same destination on Friday. Booking six separate partially filled trucks would waste capacity and potentially increase transportation costs. Instead, compatible shipments can be grouped into one load. Compatibility can depend on factors such as departure location, shipping time, vehicle capacity, weight, volume, destination, and organizational transportation rules. This gives transportation planners an opportunity to use available vehicle capacity more efficiently.

LOAD TEMPLATES
Physical vehicles have limits. A truck can only carry a certain amount of weight and volume. Containers and trailers also have physical restrictions. Dynamics 365 uses load templates to represent reusable limits for different types of vehicles or containers. Organizations could create templates for small delivery trucks, large trailers, or shipping containers. These templates can include limits such as maximum weight, volume, and height. This helps planners determine whether a proposed load realistically fits the transportation capacity available.

VOLUME-BASED LOAD BUILDING
Dynamics 365 also supports volume-based load building. Despite the technical name, the concept is straightforward: Dynamics uses information from the load template to help determine whether goods fit within the configured transportation limits. The planner can still override values when real-world circumstances require an exception. The system therefore provides a standard planning framework without pretending transportation always follows perfectly predictable conditions.

CARRIERS EXPLAINED
The carrier is responsible for physically moving the goods. That could be an external transportation company collecting freight from the warehouse, or it could represent the organization's own fleet. Even businesses operating their own trucks still require transportation planning. They need to determine which goods travel together, where the vehicle travels, and potentially how transportation costs should be allocated. Dynamics 365 Transportation Management can support both scenarios.

ROUTES AND SERVICES
A route describes how goods travel between their starting point and destination. Different services might provide different combinations of speed, availability, and cost. A standard road freight service might be less expensive but take longer, while an expedited option might cost considerably more while helping the organization meet an urgent customer commitment. Transportation planning therefore isn't simply about finding a vehicle. It is about selecting a transportation option that balances delivery requirements with cost.

TRANSPORTATION RATES
Rates represent the expected transportation charges associated with carrier services and routes. Organizations can maintain rate tables containing agreed carrier prices and transportation rules. Instead of searching through old emails or spreadsheets every time transportation needs to be booked, planners can use structured rate information already maintained inside Dynamics 365. When carrier contracts and prices change, those rate records can be updated accordingly.

THE RATE ROUTE WORKBENCH
The Rate Route Workbench gives transportation planners a place to compare route and rate options for a shipment. One option might be faster while another costs less. Dynamics 365 provides the available transportation information, but the business still determines which trade-off makes sense. An urgent customer order might justify an expensive expedited service. Another customer might accept a longer delivery time in exchange for lower transportation costs.

DYNAMICS 365 IS NOT A LIVE CARRIER MARKETPLACE
An important distinction is that the built-in Transportation Management module doesn't automatically behave like a live marketplace comparing real-time prices across every available carrier. Its built-in planning processes use the carrier, route, and rate information maintained by the organization. Companies requiring live multi-carrier rate shopping, extensive booking integrations, or deeper shipment tracking can connect specialized third-party transportation management solutions. Dynamics 365 remains the internal transportation planning layer while external platforms can extend the carrier-facing capabilities.

FROM SALES ORDER TO CUSTOMER DELIVERY
For outbound transportation, the process begins with customer demand. The sales order defines what the customer purchased, where the products need to go, and when delivery is expected. Those products become part of a shipment, and shipments can be assigned to a planned load. Warehouse employees then pick, pack, stage, and load the products. Because the warehouse work connects with the transportation plan, employees can see which goods belong together and which carrier is expected to collect them.

CONNECTING TRANSPORTATION AND WAREHOUSE MANAGEMENT
Transportation planning and warehouse execution are closely connected. Transportation Management determines how goods should travel. Warehouse operations physically prepare those goods for movement. Instead of warehouse employees preparing pallets without knowing which transportation plan they belong to, shipments can remain connected to their loads. This reduces the need to reconcile separate transportation spreadsheets, warehouse lists, emails, and paper documents at the loading dock.

Become a supporter of this podcast: https://www.spreaker.com/podcast/m365-fm-modern-work-security-and-productivity-with-microsoft-365--6704921/support.

πŸš€ Want to be part of m365.fm?

Then stop just listening… and start showing up.

πŸ‘‰ Connect with me on LinkedIn and let’s make something happen:

  • πŸŽ™οΈ Be a podcast guest and share your story
  • 🎧 Host your own episode (yes, seriously)
  • πŸ’‘ Pitch topics the community actually wants to hear
  • 🌍 Build your personal brand in the Microsoft 365 space

This isn’t just a podcast — it’s a platform for people who take action.

πŸ”₯ Most people wait. The best ones don’t.

πŸ‘‰ Connect with me on LinkedIn and send me a message:
"I want in"

Let’s build something awesome πŸ‘Š

Frequently Asked Questions

What is Dynamics 365 Transportation Management?

It is the transportation planning module within Dynamics 365 Supply Chain Management that connects physical goods movement with sales orders, purchase orders, warehouse operations, carriers, and freight costs.

How do load templates work in Dynamics 365?

Load templates represent reusable sets of limitsβ€”such as maximum weight, volume, and heightβ€”for different types of vehicles or containers, helping planners ensure shipments realistically fit available transport capacity.

Can Dynamics 365 compare live rates across multiple carriers?

No, the built-in transportation module relies on rate tables and rules maintained by your organization rather than functioning as a live real-time carrier rate shopping marketplace.

1
00:00:00,000 --> 00:00:04,200
Hello and welcome to another episode of Microsoft Knowledge Nuggets here on M365FM.

2
00:00:04,200 --> 00:00:05,840
I'm your host, Mirko Peters.

3
00:00:05,840 --> 00:00:09,600
Today's topic is one that almost everyone who works with supply chains has heard of,

4
00:00:09,600 --> 00:00:11,360
but few people truly understand.

5
00:00:11,360 --> 00:00:13,720
Dynamics 365 Transportation Management.

6
00:00:13,720 --> 00:00:14,400
Here's the problem.

7
00:00:14,400 --> 00:00:18,560
A customer places an order, stocks sits in the warehouse, a carrier needs a pick-up time,

8
00:00:18,560 --> 00:00:22,520
the customer expects delivery, and later a freight bill lands on someone's desk.

9
00:00:22,520 --> 00:00:25,360
For years, those steps lived in separate spreadsheets, phone calls,

10
00:00:25,360 --> 00:00:28,840
rate sheets, and handoffs between teams out, and that creates gaps.

11
00:00:28,840 --> 00:00:31,720
The warehouse might prepare goods before transport has a plan.

12
00:00:31,720 --> 00:00:34,600
Finance might see a bill without knowing what anyone agreed to pay.

13
00:00:34,600 --> 00:00:36,720
So what exactly is transportation management?

14
00:00:36,720 --> 00:00:41,840
In plain English, it's the transportation desk inside Dynamics 365 Supply Chain Management.

15
00:00:41,840 --> 00:00:44,720
It connects warehouse doors, vendors, customers, and carriers.

16
00:00:44,720 --> 00:00:48,480
Will plan loads, choose routes and rates, ship goods, and check freight charges?

17
00:00:48,480 --> 00:00:52,280
By the end of this episode, you'll see how all these pieces fit together to make your work

18
00:00:52,280 --> 00:00:55,880
life easier.

19
00:00:55,880 --> 00:00:58,760
Why transportation management exists?

20
00:00:58,760 --> 00:01:00,880
Let's start with the basic truth.

21
00:01:00,880 --> 00:01:04,280
Physical goods don't move just because a sales order exists on the screen.

22
00:01:04,280 --> 00:01:07,960
They need a truck, a trailer, a container, or another way to travel.

23
00:01:07,960 --> 00:01:11,600
Someone needs to know where the goods start, where they need to arrive, how much space

24
00:01:11,600 --> 00:01:14,640
they take up, when they need to leave, and what the trip should cost.

25
00:01:14,640 --> 00:01:18,000
Now when you picture one box going to one customer, it sounds simple.

26
00:01:18,000 --> 00:01:22,000
But a real company might send many orders from the same warehouse on the same day, receive

27
00:01:22,000 --> 00:01:26,760
goods from several vendors and move stock between its own sites at the same time.

28
00:01:26,760 --> 00:01:30,480
Each movement has people, dates, space, and money attached to it.

29
00:01:30,480 --> 00:01:33,840
Without a shared system, each team sees only its own piece.

30
00:01:33,840 --> 00:01:35,520
Sales sees the customer order.

31
00:01:35,520 --> 00:01:39,880
Purchasing sees the vendor order, warehouse staff see the items they need to pick, pack,

32
00:01:39,880 --> 00:01:41,200
receive, or put away.

33
00:01:41,200 --> 00:01:44,920
The transport team sees a list of things that must move often after everyone else has

34
00:01:44,920 --> 00:01:45,920
already done their part.

35
00:01:45,920 --> 00:01:47,680
That's where delays and confusion start.

36
00:01:47,680 --> 00:01:49,080
Here's a concrete example.

37
00:01:49,080 --> 00:01:52,560
Imagine a warehouse has 10 customer orders ready for the same city.

38
00:01:52,560 --> 00:01:56,320
If nobody connects those orders before booking transport, the company might arrange several

39
00:01:56,320 --> 00:02:00,160
partly filled trips, or the carrier might arrive before the warehouse knows which goods belong

40
00:02:00,160 --> 00:02:01,160
on the vehicle.

41
00:02:01,160 --> 00:02:03,280
The goods are ready, but the movement isn't planned.

42
00:02:03,280 --> 00:02:07,880
So transportation management gives that movement a place inside Dynamics 365 Supply Chain

43
00:02:07,880 --> 00:02:08,880
Management.

44
00:02:08,880 --> 00:02:12,440
It's not a separate consumer shipping app where you type in a tracking number and watch

45
00:02:12,440 --> 00:02:14,440
a parcel move across a map.

46
00:02:14,440 --> 00:02:18,040
Instead, it works with the business records already inside the connected platform, and

47
00:02:18,040 --> 00:02:20,320
order creates the need for goods to move.

48
00:02:20,320 --> 00:02:22,200
Warehouse work prepares the goods.

49
00:02:22,200 --> 00:02:25,280
Transportation management plans, how those goods travel between locations.

50
00:02:25,280 --> 00:02:28,240
Think of it like the transportation desk in an office building.

51
00:02:28,240 --> 00:02:31,000
The sales team brings a customer request to the desk.

52
00:02:31,000 --> 00:02:34,600
Purchasing brings news that a vendor will send goods in, the warehouse brings the actual

53
00:02:34,600 --> 00:02:36,160
stock and the loading doors.

54
00:02:36,160 --> 00:02:39,960
The transportation desk connects those requests to the company's transport plan.

55
00:02:39,960 --> 00:02:41,320
There are two main directions.

56
00:02:41,320 --> 00:02:44,400
Inbound transportation means goods travel into your business.

57
00:02:44,400 --> 00:02:47,880
You've ordered items from a vendor, and those items need to reach your warehouse.

58
00:02:47,880 --> 00:02:51,160
Sometimes the vendor controls that trip, sometimes your company arranges it, either way

59
00:02:51,160 --> 00:02:54,680
you need a clear plan for getting the goods to the right place and receiving them when

60
00:02:54,680 --> 00:02:55,680
they arrive.

61
00:02:55,680 --> 00:02:58,760
Outbound transportation means goods travel out of your business.

62
00:02:58,760 --> 00:03:03,400
A customer has ordered products, the warehouse prepares them, and a carrier or company vehicle

63
00:03:03,400 --> 00:03:04,800
takes them to the customer.

64
00:03:04,800 --> 00:03:07,640
Both flows deal with movement, but the starting point differs.

65
00:03:07,640 --> 00:03:09,880
Inbound starts with a purchase order and a vendor.

66
00:03:09,880 --> 00:03:12,280
Outbound starts with a sales order and a customer.

67
00:03:12,280 --> 00:03:14,760
There's also a third type that beginners often miss.

68
00:03:14,760 --> 00:03:15,760
Transfer orders.

69
00:03:15,760 --> 00:03:19,360
Transfer order moves stock between your own company locations.

70
00:03:19,360 --> 00:03:22,440
Maybe one warehouse has too much stock and another warehouse needs it.

71
00:03:22,440 --> 00:03:26,320
No customer purchase is involved, but the physical goods still need transport.

72
00:03:26,320 --> 00:03:31,040
In Dynamics 365 Transportation Management, transfer orders belong to the outbound scenario

73
00:03:31,040 --> 00:03:33,240
and can be planned alongside sales orders.

74
00:03:33,240 --> 00:03:35,160
That makes sense when you picture the loading dock.

75
00:03:35,160 --> 00:03:39,720
Oh, whether a pallet travels to a paying customer or to another company warehouse, somebody

76
00:03:39,720 --> 00:03:44,840
still needs to arrange the vehicle, reserve space, and send it out from the same door.

77
00:03:44,840 --> 00:03:48,960
So this connected approach replaces the old chain of separate lists and phone calls

78
00:03:48,960 --> 00:03:50,440
with shared information.

79
00:03:50,440 --> 00:03:54,480
The order tells the system what needs to move, the warehouse prepares the items.

80
00:03:54,480 --> 00:03:57,240
Transportation management turns that need into a transport plan.

81
00:03:57,240 --> 00:04:01,400
Once goods need to move, the system first needs a workable shipping plan.

82
00:04:01,400 --> 00:04:02,400
Planning the load.

83
00:04:02,400 --> 00:04:06,840
Today's knowledge nugget is about something every logistics team needs, but often explains

84
00:04:06,840 --> 00:04:08,360
differently.

85
00:04:08,360 --> 00:04:09,840
Planning a load.

86
00:04:09,840 --> 00:04:13,520
You can start planning transportation from either orders or shipments, or myicopeters

87
00:04:13,520 --> 00:04:16,600
from M365, FM, and let me clear up a myth right away.

88
00:04:16,600 --> 00:04:18,320
A shipping plan doesn't start from scratch.

89
00:04:18,320 --> 00:04:20,000
It starts from records you already have.

90
00:04:20,000 --> 00:04:22,040
A sales order holds what a customer bought.

91
00:04:22,040 --> 00:04:26,240
A purchase order lists, what a vendor needs to send, a shipment groups, those items into

92
00:04:26,240 --> 00:04:29,640
a more focused shipping record, ready to be combined with others.

93
00:04:29,640 --> 00:04:31,440
So which starting point should you use?

94
00:04:31,440 --> 00:04:33,040
That depends on how your company works.

95
00:04:33,040 --> 00:04:36,200
Some teams plan early, looking directly at order lines.

96
00:04:36,200 --> 00:04:39,680
Other teams create shipments first, then decide what travels together.

97
00:04:39,680 --> 00:04:41,320
Both parts lead to the same question.

98
00:04:41,320 --> 00:04:42,800
What should go on the same vehicle?

99
00:04:42,800 --> 00:04:44,120
Here's the simplest definition.

100
00:04:44,120 --> 00:04:47,560
A load is the digital record for a planned movement of goods.

101
00:04:47,560 --> 00:04:51,720
You can picture it as one truck, one trailer, one container, or one collection of shipments

102
00:04:51,720 --> 00:04:52,920
that travel together.

103
00:04:52,920 --> 00:04:57,120
It gives you one place to see which goods belong together before physical work starts.

104
00:04:57,120 --> 00:04:58,920
Now here's something many people get wrong.

105
00:04:58,920 --> 00:05:01,760
A load doesn't mean every item fits inside one physical box.

106
00:05:01,760 --> 00:05:04,720
It means the system groups goods around one transport plan.

107
00:05:04,720 --> 00:05:06,680
Several customer shipments may share one truck.

108
00:05:06,680 --> 00:05:09,240
A large order might fill a whole trailer by itself.

109
00:05:09,240 --> 00:05:12,200
A container arriving from a vendor can also become a load.

110
00:05:12,200 --> 00:05:14,040
Even before your warehouse receives the goods.

111
00:05:14,040 --> 00:05:17,000
The point is to stop treating each order as its own trip.

112
00:05:17,000 --> 00:05:20,600
Imagine a distributor has six customer orders ready for Friday delivery.

113
00:05:20,600 --> 00:05:24,080
All six sit in the same area, and each order fills only part of a truck.

114
00:05:24,080 --> 00:05:28,640
Sending six half empty vehicles, wastes, space, and creates six separate transport jobs.

115
00:05:28,640 --> 00:05:31,360
The team can instead group compatible shipments into one load.

116
00:05:31,360 --> 00:05:34,120
Compatible means they can reasonably travel together.

117
00:05:34,120 --> 00:05:37,880
They leave from the same warehouse, need to go around the same time, fit within vehicle

118
00:05:37,880 --> 00:05:39,960
limits, and follow your shipping rules.

119
00:05:39,960 --> 00:05:43,240
The system helps bring those records together instead of relying on someone to spot the

120
00:05:43,240 --> 00:05:44,480
pattern in a spreadsheet.

121
00:05:44,480 --> 00:05:46,040
That group now has a shared plan.

122
00:05:46,040 --> 00:05:48,160
A warehouse sees what belongs on the load.

123
00:05:48,160 --> 00:05:50,880
The transport planner sees the total space and wait.

124
00:05:50,880 --> 00:05:54,360
People don't need to rebuild the same list in emails, notes, or a separate file.

125
00:05:54,360 --> 00:05:55,600
But here's the thing.

126
00:05:55,600 --> 00:05:58,160
Grouping goods isn't just about putting more items together.

127
00:05:58,160 --> 00:06:02,520
A truck has limits, wait, floor space, height, a container has its own rules.

128
00:06:02,520 --> 00:06:06,600
If the system groups goods without checking those limits, the load may look fine on screen,

129
00:06:06,600 --> 00:06:08,240
but fail at the loading dock.

130
00:06:08,240 --> 00:06:11,360
Dynamics 365 uses load templates to help avoid that.

131
00:06:11,360 --> 00:06:16,000
Think of a load template as a reusable set of limits for a type of vehicle or container.

132
00:06:16,000 --> 00:06:19,600
Create one for a small delivery truck, another for a larger trailer, another for a shipping

133
00:06:19,600 --> 00:06:20,600
container.

134
00:06:20,600 --> 00:06:24,840
Each template holds limits for weight, volume, height, and other rules your company needs.

135
00:06:24,840 --> 00:06:27,640
The template gives the load a shape before you start filling it.

136
00:06:27,640 --> 00:06:31,360
So if a shipment weighs too much or takes up too much room, the planner sees it doesn't

137
00:06:31,360 --> 00:06:32,520
belong on that load.

138
00:06:32,520 --> 00:06:36,000
The answer might be a second vehicle, a different template, or a different grouping of

139
00:06:36,000 --> 00:06:37,000
shipments.

140
00:06:37,000 --> 00:06:40,320
The software doesn't lift pallets, but it does give your team a clearer plan before

141
00:06:40,320 --> 00:06:41,920
physical work begins.

142
00:06:41,920 --> 00:06:45,840
One built-in approach is called volume-based load building.

143
00:06:45,840 --> 00:06:47,920
That sounds more technical than it needs to.

144
00:06:47,920 --> 00:06:52,400
It means the system uses the maximum height and weight from your load template when building

145
00:06:52,400 --> 00:06:53,760
or suggesting a load.

146
00:06:53,760 --> 00:06:57,040
In plain English, it checks whether the goods fit within the limits you set.

147
00:06:57,040 --> 00:06:58,520
Those values aren't locked forever.

148
00:06:58,520 --> 00:07:01,400
A planner can override them when real world needs change.

149
00:07:01,400 --> 00:07:03,200
Maybe a carrier sends a different trailer.

150
00:07:03,200 --> 00:07:04,560
Maybe a trip allows a different height.

151
00:07:04,560 --> 00:07:08,720
The template supplies the normal rule, and the override handles the exception without

152
00:07:08,720 --> 00:07:09,720
rebuilding everything.

153
00:07:09,720 --> 00:07:11,880
Let's return to those six customer orders.

154
00:07:11,880 --> 00:07:14,720
Each alone might take up 15% of a truck.

155
00:07:14,720 --> 00:07:18,200
Plan separately, you could send six mostly empty vehicles.

156
00:07:18,200 --> 00:07:22,400
Grouped into one load, the same orders may fill most of one truck with room left for more.

157
00:07:22,400 --> 00:07:23,400
That's a better use of space.

158
00:07:23,400 --> 00:07:25,480
Now, the same idea works both directions.

159
00:07:25,480 --> 00:07:28,760
For inbound planning, create a load around items coming from a vendor.

160
00:07:28,760 --> 00:07:32,560
The transport plan connects to the expected receipt, so the warehouse knows what's due and

161
00:07:32,560 --> 00:07:33,760
prepares for arrival.

162
00:07:33,760 --> 00:07:37,160
Instead of learning about a delivery only when it appears at the gate, the receiving

163
00:07:37,160 --> 00:07:38,680
team has a planned record.

164
00:07:38,680 --> 00:07:42,480
For outbound planning, select warehouse items that need to leave for customers and

165
00:07:42,480 --> 00:07:43,640
group them into a load.

166
00:07:43,640 --> 00:07:47,640
The warehouse prepares those goods based on the load details, not a disconnected list.

167
00:07:47,640 --> 00:07:53,040
One full load still needs a way to travel, a company to move it and an expected charge.

168
00:07:53,040 --> 00:07:56,000
Roots, carriers and rates.

169
00:07:56,000 --> 00:07:58,560
The load now tells you what needs to travel together.

170
00:07:58,560 --> 00:08:02,560
Next, you need to decide who moves it, which service they use, and what that trip should

171
00:08:02,560 --> 00:08:03,560
cost.

172
00:08:03,560 --> 00:08:05,360
The company that moves your goods is called the carrier.

173
00:08:05,360 --> 00:08:08,920
It can be an outside transport company that collects and delivers your freight.

174
00:08:08,920 --> 00:08:11,920
It can also mean your own fleet if you run your own trucks and drivers.

175
00:08:11,920 --> 00:08:15,560
Either way, the carrier is responsible for the physical trip.

176
00:08:15,560 --> 00:08:19,440
That distinction matters because you still need a plan, even when the truck belongs to you.

177
00:08:19,440 --> 00:08:22,640
With an outside carrier you agree on prices and services ahead of time.

178
00:08:22,640 --> 00:08:26,160
With your own fleet, you may still want the transport charge calculated, especially if

179
00:08:26,160 --> 00:08:28,680
delivery costs appear on customer orders.

180
00:08:28,680 --> 00:08:32,120
Dynamics 365 transportation management supports both situations.

181
00:08:32,120 --> 00:08:33,120
Then there's the route.

182
00:08:33,120 --> 00:08:37,080
A route is the planned path from pick up to destination along with the service choice.

183
00:08:37,080 --> 00:08:38,760
It answers practical questions.

184
00:08:38,760 --> 00:08:40,760
Which warehouse does the carrier collect from?

185
00:08:40,760 --> 00:08:43,160
Which customer or location receives the goods?

186
00:08:43,160 --> 00:08:45,120
Which carrier service handles the trip?

187
00:08:45,120 --> 00:08:48,800
Picture a delivery leaving your main warehouse for a customer across the country.

188
00:08:48,800 --> 00:08:52,400
One route may use standard road freight that costs less but takes longer.

189
00:08:52,400 --> 00:08:55,120
Another may use a faster, more expensive service.

190
00:08:55,120 --> 00:08:57,920
Same starting and ending point, but the transport choice changes.

191
00:08:57,920 --> 00:08:59,920
A rate is the expected charge for that choice.

192
00:08:59,920 --> 00:09:02,480
It's not a random number typed in at the last minute.

193
00:09:02,480 --> 00:09:06,760
Rates come from pricing agreements with carriers, combined with shipment or route details.

194
00:09:06,760 --> 00:09:07,760
Where the goods start?

195
00:09:07,760 --> 00:09:08,560
Where they go?

196
00:09:08,560 --> 00:09:09,560
The service used.

197
00:09:09,560 --> 00:09:12,440
The amount transported, so a route tells you how goods should move.

198
00:09:12,440 --> 00:09:14,600
A rate tells you what you expect to pay.

199
00:09:14,600 --> 00:09:18,280
Those two ideas belong together because a cheap route may miss your delivery promise, while

200
00:09:18,280 --> 00:09:20,840
speed may cost more than the order supports.

201
00:09:20,840 --> 00:09:22,320
Transport planning isn't just finding a truck.

202
00:09:22,320 --> 00:09:28,080
It's choosing a service that fits your customer commitment and the company's cost rules.

203
00:09:28,080 --> 00:09:30,600
Dynamics 365 includes the rate route workbench.

204
00:09:30,600 --> 00:09:32,880
The name sounds formal but the purpose is simple.

205
00:09:32,880 --> 00:09:37,640
It gives planners a place to compare route and rate choices for a shipment side by side.

206
00:09:37,640 --> 00:09:41,080
Instead of checking one carrier table, then another and comparing in a separate file, you

207
00:09:41,080 --> 00:09:43,680
review the choices connected to that shipping need.

208
00:09:43,680 --> 00:09:45,880
Maybe one option reaches the customer sooner.

209
00:09:45,880 --> 00:09:47,280
Maybe another costs less.

210
00:09:47,280 --> 00:09:51,800
The system doesn't know every customer values speed more than cost, because businesses work

211
00:09:51,800 --> 00:09:52,800
differently.

212
00:09:52,800 --> 00:09:57,120
A customer may have paid for urgent delivery, so the faster route makes sense.

213
00:09:57,120 --> 00:10:00,600
Another accepts longer delivery and the lower charge fits better.

214
00:10:00,600 --> 00:10:02,440
People still make the decision.

215
00:10:02,440 --> 00:10:06,040
Transportation management gives you agreed choices and expected costs, while your business

216
00:10:06,040 --> 00:10:08,040
decides which trade-off works.

217
00:10:08,040 --> 00:10:10,440
Here's what the built-in module actually does.

218
00:10:10,440 --> 00:10:15,080
Rate information comes from rate tables, your company enters and maintains in Dynamics 365.

219
00:10:15,080 --> 00:10:18,920
Think of these tables as stored records of agreed carrier prices and route rules.

220
00:10:18,920 --> 00:10:22,680
If you've negotiated a price for a certain service in lane, that information sits in the

221
00:10:22,680 --> 00:10:24,160
system and supports planning.

222
00:10:24,160 --> 00:10:26,360
That works well when your rates follow known agreements.

223
00:10:26,360 --> 00:10:31,000
For example, work with a few regular carriers, serve familiar routes, and update prices when

224
00:10:31,000 --> 00:10:32,000
contracts change.

225
00:10:32,000 --> 00:10:36,280
Transport planner uses rates already recorded instead of hunting through old emails, but here's

226
00:10:36,280 --> 00:10:38,200
something many people misunderstand.

227
00:10:38,200 --> 00:10:41,920
The built-in module doesn't act like a live shopping site connected to every carrier.

228
00:10:41,920 --> 00:10:45,960
It doesn't automatically pull fresh prices from live feeds and compare across a broad network

229
00:10:45,960 --> 00:10:46,960
in real time.

230
00:10:46,960 --> 00:10:50,560
If your company needs multi-carrier rate shopping, live booking links, or deeper shipment status

231
00:10:50,560 --> 00:10:52,960
updates, you normally connect a third party system.

232
00:10:52,960 --> 00:10:55,160
That's not a failure of transportation management.

233
00:10:55,160 --> 00:10:56,880
It defines its job clearly.

234
00:10:56,880 --> 00:11:01,160
These tools handle structured transport planning, inside supply chain management, using the

235
00:11:01,160 --> 00:11:04,480
carrier, route, and rate information your company maintains.

236
00:11:04,480 --> 00:11:07,240
And it's also not a consumer-pastel tracking website.

237
00:11:07,240 --> 00:11:11,920
You won't use it like a map where you enter one tracking number and watch a vehicle icon

238
00:11:11,920 --> 00:11:13,000
travel down a road.

239
00:11:13,000 --> 00:11:16,960
This module focuses on business transport decisions before and around the shipment, which

240
00:11:16,960 --> 00:11:20,880
goods move together, which carrier handles them, which route applies, what the trip should

241
00:11:20,880 --> 00:11:21,880
cost.

242
00:11:21,880 --> 00:11:26,680
Once your company selects that plan, the warehouse and transport teams need to carry it out.

243
00:11:26,680 --> 00:11:30,720
From warehouse door to customer door, a transport plan only helps when people can actually turn

244
00:11:30,720 --> 00:11:32,000
it into a real shipment.

245
00:11:32,000 --> 00:11:35,720
For an outbound order, the flow usually starts when a customer buys something.

246
00:11:35,720 --> 00:11:38,800
The sales order tells the business what the customer wants, where it needs to go, and

247
00:11:38,800 --> 00:11:39,880
when it should arrive.

248
00:11:39,880 --> 00:11:43,640
That order becomes a shipment, and the shipment joins a planned load with other goods traveling

249
00:11:43,640 --> 00:11:44,640
on the same trip.

250
00:11:44,640 --> 00:11:46,040
Then the warehouse takes over.

251
00:11:46,040 --> 00:11:50,080
Workers pick the items from storage, pack them, and bring them to the right loading area.

252
00:11:50,080 --> 00:11:53,760
Because the shipment belongs to a load, the team can see which goods need to leave together,

253
00:11:53,760 --> 00:11:55,400
and which carrier will collect them.

254
00:11:55,400 --> 00:11:59,200
When the vehicle arrives, the goods move from the warehouse to the carrier, and the carrier

255
00:11:59,200 --> 00:12:00,680
takes them to the customer.

256
00:12:00,680 --> 00:12:02,880
Every step connects to the same movement record.

257
00:12:02,880 --> 00:12:04,760
That sounds ordinary, but imagine the old way.

258
00:12:04,760 --> 00:12:06,640
A picker might work from a printed order.

259
00:12:06,640 --> 00:12:10,480
A transport planner might hold a separate list, and someone at the loading door might search

260
00:12:10,480 --> 00:12:13,840
through emails to check which carrier should take which pallets.

261
00:12:13,840 --> 00:12:16,880
If one detail changed, everybody needed the updated version.

262
00:12:16,880 --> 00:12:19,920
With transportation management, the load gives the teams a shared record out.

263
00:12:19,920 --> 00:12:23,320
The warehouse can see the items connected to the load, the transport planner can see the

264
00:12:23,320 --> 00:12:27,160
shipment details, and the person arranging the pick up can see the planned carrier and

265
00:12:27,160 --> 00:12:28,760
service.

266
00:12:28,760 --> 00:12:32,760
Instead of passing around several paper lists, people work from information linked to the

267
00:12:32,760 --> 00:12:34,480
same order and shipment.

268
00:12:34,480 --> 00:12:35,640
Here's a simple example.

269
00:12:35,640 --> 00:12:39,400
A warehouse has orders for several customers in the same delivery area.

270
00:12:39,400 --> 00:12:43,760
One customer ordered cartons of cleaning supplies, another ordered paper products, and a third

271
00:12:43,760 --> 00:12:45,480
ordered a small batch of equipment.

272
00:12:45,480 --> 00:12:48,560
Each order needs picking and packing, but the transport team doesn't have to treat them

273
00:12:48,560 --> 00:12:49,880
as completely separate trips.

274
00:12:49,880 --> 00:12:51,880
They assign the shipments to one planned load.

275
00:12:51,880 --> 00:12:56,400
Warehouse staff pick each order, pack it correctly, and prepare it for the loading area.

276
00:12:56,400 --> 00:12:59,480
The load record tells them that all those shipments travel together.

277
00:12:59,480 --> 00:13:03,240
When the carrier arrives, the team hands over the goods for one planned movement instead

278
00:13:03,240 --> 00:13:06,680
of trying to match loose pallets to a driver at the last minute.

279
00:13:06,680 --> 00:13:09,000
The customer still receives their own order.

280
00:13:09,000 --> 00:13:12,880
Behind the scenes, though, the business planned that delivery as part of a larger movement,

281
00:13:12,880 --> 00:13:16,560
that link helps the warehouse work with the transport team instead of working ahead of

282
00:13:16,560 --> 00:13:19,440
it or waiting for instructions that arrive too late.

283
00:13:19,440 --> 00:13:23,560
Inbound transportation follows the same connected idea, just in the other direction.

284
00:13:23,560 --> 00:13:27,080
A purchase order tells you that your company expects goods from a vendor.

285
00:13:27,080 --> 00:13:30,760
When your business arranges the transport, a planned inbound load connects the incoming

286
00:13:30,760 --> 00:13:33,720
items to the trip before the goods reach the warehouse.

287
00:13:33,720 --> 00:13:37,480
The vendor sends the shipment, the carrier brings it to your site, and the warehouse receives

288
00:13:37,480 --> 00:13:38,480
it.

289
00:13:38,480 --> 00:13:40,760
Receiving staff can prepare because they know what should arrive.

290
00:13:40,760 --> 00:13:43,960
They can check the planned load against the goods that turn up at the dock, oh, much

291
00:13:43,960 --> 00:13:47,240
clearer than a truck appearing with little warning and someone trying to work out which

292
00:13:47,240 --> 00:13:49,520
purchase order the pallets belong to.

293
00:13:49,520 --> 00:13:51,640
Transfer orders fit this process too.

294
00:13:51,640 --> 00:13:54,800
One company site sends stock out while another company site receives it.

295
00:13:54,800 --> 00:13:58,520
The first warehouse prepares the items and ships them and the second warehouse expects the

296
00:13:58,520 --> 00:14:01,080
same items and receives them into its stock.

297
00:14:01,080 --> 00:14:04,840
No outside customer sits at the end of that trip, but the company still needs a clear hand

298
00:14:04,840 --> 00:14:06,560
off between the two locations.

299
00:14:06,560 --> 00:14:10,600
The load connects the sending and receiving work around one planned movement.

300
00:14:10,600 --> 00:14:13,880
Customer delivery choices also stay connected to the shipping decision.

301
00:14:13,880 --> 00:14:17,840
If a planner chooses a faster carrier service because a customer needs goods quickly, that

302
00:14:17,840 --> 00:14:19,600
choice connects to the shipment.

303
00:14:19,600 --> 00:14:23,480
If the business uses a lower cost service because the delivery date allows it, that choice

304
00:14:23,480 --> 00:14:24,480
connects to it.

305
00:14:24,480 --> 00:14:28,320
People can trace the delivery cost back to the route and carrier choice that created it.

306
00:14:28,320 --> 00:14:32,000
The vehicle may leave the dock and the goods may arrive safely, but the work still isn't

307
00:14:32,000 --> 00:14:33,000
finished.

308
00:14:33,000 --> 00:14:36,840
The carrier sends a freight bill afterward and somebody needs to check it.

309
00:14:36,840 --> 00:14:39,400
Freight costs and reconciliation.

310
00:14:39,400 --> 00:14:42,640
The goods have left the warehouse and the delivery may even be complete.

311
00:14:42,640 --> 00:14:43,960
Then the carrier invoice arrives.

312
00:14:43,960 --> 00:14:47,720
That invoice needs checking because the amount on the bill should connect back to the transport

313
00:14:47,720 --> 00:14:53,280
choice the company planned earlier, a/o, including the carrier, route, service, load details and

314
00:14:53,280 --> 00:14:55,120
expected freight charge.

315
00:14:55,120 --> 00:14:59,480
During planning, Dynamics 365 can calculate and expect a transport charge from the company's

316
00:14:59,480 --> 00:15:00,480
rate information.

317
00:15:00,480 --> 00:15:04,680
That expected amount gives the business a starting point before the carrier asks for payment.

318
00:15:04,680 --> 00:15:07,160
Later the carrier sends its freight invoice.

319
00:15:07,160 --> 00:15:11,120
Freight reconciliation means comparing that invoice with the rate and shipment details already

320
00:15:11,120 --> 00:15:12,360
recorded in the system.

321
00:15:12,360 --> 00:15:15,720
In plain English, the company checks whether the carrier charged what the company expected

322
00:15:15,720 --> 00:15:17,520
for the service that actually moved the goods.

323
00:15:17,520 --> 00:15:20,320
Imagine the plan showed a charge of $500.

324
00:15:20,320 --> 00:15:24,160
The carrier invoice also shows $500 and the shipment details match.

325
00:15:24,160 --> 00:15:27,680
That bill has a clear path through the checking process because the planned record and the

326
00:15:27,680 --> 00:15:28,880
invoice agree.

327
00:15:28,880 --> 00:15:30,960
But invoices don't always match the plan.

328
00:15:30,960 --> 00:15:34,640
Maybe the rate table was wrong, maybe the carrier billed for a different service, or maybe

329
00:15:34,640 --> 00:15:38,440
the load changed after planning and a charge needs an explanation.

330
00:15:38,440 --> 00:15:42,280
Without a connected record, finance may only see an invoice number and an amount, then spend

331
00:15:42,280 --> 00:15:45,400
time asking the warehouse and transport team what happened.

332
00:15:45,400 --> 00:15:48,680
Our management keeps the transport decision connected to that check.

333
00:15:48,680 --> 00:15:52,920
Rules can compare the carrier invoice with the expected amount and plan shipment information.

334
00:15:52,920 --> 00:15:57,080
When the details fit within the company's accepted rules, the invoice can move forward.

335
00:15:57,080 --> 00:16:01,040
When the details don't fit, the system sends the difference for someone to review.

336
00:16:01,040 --> 00:16:04,000
That means people don't approve every freight charge blindly.

337
00:16:04,000 --> 00:16:08,440
A transport planner may need to confirm that the carrier used a different service, or someone

338
00:16:08,440 --> 00:16:11,720
in finance may need to ask why an extra charge appeared.

339
00:16:11,720 --> 00:16:14,560
The point isn't to assume every mismatch is wrong, are you?

340
00:16:14,560 --> 00:16:16,920
The point is to notice the mismatch before payment.

341
00:16:16,920 --> 00:16:19,600
This joins operations and finance around the same shipment.

342
00:16:19,600 --> 00:16:23,920
The transport team chooses a carrier and service, that choice creates an expected cost,

343
00:16:23,920 --> 00:16:27,840
the warehouse sends the goods, and finance checks the later invoice against the record of

344
00:16:27,840 --> 00:16:29,800
what the company planned.

345
00:16:29,800 --> 00:16:32,920
Each team sees a different part, but they are looking at connected information.

346
00:16:32,920 --> 00:16:35,640
The built-in process has a clear scope though.

347
00:16:35,640 --> 00:16:39,640
Companies that need large scale, highly automated freight auditing, often add a third-party

348
00:16:39,640 --> 00:16:41,720
transportation management system.

349
00:16:41,720 --> 00:16:45,640
Those tools can bring deeper carrier connections and more automated checking rules.

350
00:16:45,640 --> 00:16:49,800
The built-in module handles the planned cost and reconciliation work inside supply chain

351
00:16:49,800 --> 00:16:54,200
management, while another system can extend that work when the business needs more.

352
00:16:54,200 --> 00:16:58,360
Put all of these building blocks together and the full picture starts to appear, where

353
00:16:58,360 --> 00:17:00,640
it fits and what it doesn't do.

354
00:17:00,640 --> 00:17:02,920
So where does transportation management actually live?

355
00:17:02,920 --> 00:17:07,160
It belongs inside Dynamics 365 supply chain management, running on the finance and operations

356
00:17:07,160 --> 00:17:08,160
apps.

357
00:17:08,160 --> 00:17:09,160
That's its home.

358
00:17:09,160 --> 00:17:13,560
It's a company that needs a structured way to plan inbound deliveries, outbound customer

359
00:17:13,560 --> 00:17:18,960
shipments, stock transfers between companies, all using their own carrier records, rate tables,

360
00:17:18,960 --> 00:17:19,960
and load rules.

361
00:17:19,960 --> 00:17:22,400
Now let's clear up a common point of confusion.

362
00:17:22,400 --> 00:17:23,880
Business central is different.

363
00:17:23,880 --> 00:17:26,920
Business central doesn't include this built-in transportation management module.

364
00:17:26,920 --> 00:17:31,040
If you're on business central and need transport planning, you're looking at a third-party transportation

365
00:17:31,040 --> 00:17:32,040
management system.

366
00:17:32,040 --> 00:17:35,160
That's the boundary, let's also keep the boundary clear on the other side.

367
00:17:35,160 --> 00:17:39,480
A built-in module doesn't replace every carrier portal, live traffic service, or advanced tracking

368
00:17:39,480 --> 00:17:40,480
tool.

369
00:17:40,480 --> 00:17:44,520
When a business needs live rates from many carriers, wider carrier choices, or deeper tracking

370
00:17:44,520 --> 00:17:47,960
after goods leave the dock, it connects a third-party TMS.

371
00:17:47,960 --> 00:17:49,840
Those tools handle the outside activity.

372
00:17:49,840 --> 00:17:51,680
Think back to the office building.

373
00:17:51,680 --> 00:17:54,200
Transportation management is the transportation desk inside that building.

374
00:17:54,200 --> 00:17:57,080
It connects to orders, warehouse work, and finance.

375
00:17:57,080 --> 00:18:00,080
It keeps the company's own transport plan together.

376
00:18:00,080 --> 00:18:02,880
Outside carrier tools may handle activity beyond that desk.

377
00:18:02,880 --> 00:18:04,280
Two different layers working together.

378
00:18:04,280 --> 00:18:07,200
Conclusion.

379
00:18:07,200 --> 00:18:08,800
Next Knowledge Nugget.

380
00:18:08,800 --> 00:18:10,400
Here's the simplest way to think about it.

381
00:18:10,400 --> 00:18:14,040
A transportation management turns business orders into planned movement of goods.

382
00:18:14,040 --> 00:18:17,720
Then it connects that movement to the freight costs the company checks afterwards.

383
00:18:17,720 --> 00:18:19,320
That's the full loop.

384
00:18:19,320 --> 00:18:21,520
Subscribe on your favorite podcast platform.

385
00:18:21,520 --> 00:18:26,440
Share this knowledge nugget with someone learning Dynamics 365, Supply Chain Management.

386
00:18:26,440 --> 00:18:29,520
Then explore our warehouse and inventory episodes next.

387
00:18:29,520 --> 00:18:32,040
Every load still depends on the stock sitting behind the warehouse door.